Build Up progress: 15th Day-

THe right shoulder and right arm is already completed. have laready installed it on to the body frame. The right arm had to be done in four separate components.-






Completed right shoulder armor






completed right arm










right wrist joint movement









Moving on to the left arm. THis too is completed and installed on the body frame. This part too had to be done in four separate components like the right atm.-

Completed left shoulder armor
Completed left arm

Comments

Popular Posts